A few weeks’ backs I was involved in a series of meetings together with my immediate client (EPCM firm representative) in tow with his client representative in the Resource & Energy industry visiting manufacturers & suppliers in the Lower Mainland. The series of meetings were to find out what we could do to improve the flow of information and products in the supply chain.
What was refreshing in these meetings was the end user – client admitting that they generally due to the nature of the multi-national set up and far reaching processes it can make the life of the supplier difficult in providing timely services or products. It was refreshing as generally in construction projects various stakeholders ram through all issues/problems lower down the food change together with a lot of finger pointing and shouting.
These large AEC / EPCM projects have too many layer of owner/ engineering/ manufacturer / supplier construction management involving innumerable bid cycles & multiple construction silos and subcontractors / suppliers creating multiple silos where risk is transferred down the supply chain where risk/contingency is at premium. In this entire process the end user client is in the process of meeting their business objectives and meet the ROI of the business objectives and ensure shortest time to market for their product or services.
Supply chain in large projects in the Resource & Energy industry valued at billions of dollars can have thousands or hundreds of supply tags and thousands or hundreds of manufacturers and suppliers strewn all over the global landscape. Our clients from the Resource & Energy industry are thus challenged to keep their project moving and meet deadlines through efficient supply chain system.
A recent study titled: Building Contractor Management Excellence – carried out by Accenture has this to say: “Under relentless pressure to control costs, companies in resources industries ranging from oil and gas to mining, chemicals and utilities are relying more than ever on outside providers to upgrade and maintain their critical production facilities and assets. But the management of contractors is not getting any easier, compelling companies to adopt a more rigorous approach.” Supply chain efficiency is key to improving a company’s financial performance in the Resource & Energy industry together with supply chain resilience to reduce disruptive risk.
A rigorous approach - a shifting of mindset is required in the construction delivery method, especially required in the digital globalized world we live and work where social, mobile, real-time, and other disruptive technologies have aligned necessitating dramatic changes within organizations, forcing them to adapt in order to maintain relevancy. This digital transformation is significantly driving real change within businesses where new models, team structures, and customer-centered philosophies are being developed quickly to stay afloat. The construction delivery model and the design, engineering and construction industry is not immune to this change neither our clients within the Resource & Energy industry.
A recent study carried out by A Weippert & S. L. Kajewski at the Queensland University of Technology, Brisbane, Australia titled: AEC Industry Culture: a need for change highlights some of the issues in the design, engineering and construction industry. "Four decades of international Architectural, Engineering, and Contractor (AEC) industry publications reinforce poor communication and information transmission; coordination; and teamwork issues, are the cause of countless performance problems on numerous AEC projects.” Interestingly, I came across a presentation by one of my LinkedIn Connections – Bill Black- titled: Is our industry broken- the answer is Yes. The construction delivery model is broken for the following reason:
Design + Engineering team:
Creates a design intent that revolves around the solution – solution is the start and the support systems revolve around it.
Procurement + Supply Chain team:
Source Procure thousands of items - which are available at different stages at different times not necessarily in the order it has to be constructed
Construction team:
Details and builds the building /structure ground up – building brick by brick at a time to its completion.
The presently industry accepted & practised construction delivery model where each practioners is working in silos with a hope that in the end everything gel together to a solution that meets the clients intent. The model illustrated above falls short to create a methodology which that resolves the issue of:
Too many layer of owner - construction management
Designing & engineering without the end delivery methodology in mind
Cost Influence lost after design/engineering stage
Innumerable bid cycles & Layer of subcontractors multiple construction silos
Risk/contingency premium when risk is carried by contractor to the construction phase
Inconsistent safety & quality
While meeting through a shifting mindset – a complete remodeled system that encompass:
Greater Accountability & Client Relationship Management
Lowered Capital Cost & Project Timeline and cost influence through project life cycle.
Design with end delivery consultation process in mind
Create efficiencies through Standardization
Maximize labour Productivity & Constructability
Improved predictability of project Execution & Risk
Improved Safety & Quality
Lower Environmental/Socioeconomic Impact
Shifting mindset is required to innovate the construction delivery model in this digital globalized economy where we have to disrupt traditional process, and rebelliously discard old business clichés and remake the construction delivery model and greatly accelerate the way we operate to understanding customer needs and problems to keep pace with a rapidly changing disruptive business environment.
We owe it to the generation that is moving into the boardrooms of the digital globalized economy to fix a system that is broken. Do you agree, I would like to hear from you?
Photo credit : Veer
-
February 2017
- Feb 10, 2017 What If We Designed the Workplace Around the “Workplace Experience”? Feb 10, 2017
-
January 2017
- Jan 20, 2017 Let's redesign everything through Circular Design Jan 20, 2017
- Jan 13, 2017 100% Orginal - Authentic Leadership Jan 13, 2017
- Jan 6, 2017 Be different – create value through collaboration in the Workplace Jan 6, 2017
-
December 2016
- Dec 23, 2016 Work and the Workplace is changing - how are we handling it? Dec 23, 2016
- Dec 21, 2016 What is the future of work and the workplace anyways? Dec 21, 2016
-
August 2016
- Aug 4, 2016 Are you making Customer Experience as an the differentiator? Aug 4, 2016
-
July 2016
- Jul 27, 2016 By ignoring the knowledge economy, Canada is taking a step backward Jul 27, 2016
- Jul 14, 2016 Green Washing & Corporate Sustainability Jul 14, 2016
-
May 2016
- May 30, 2016 A Customer Journey to Enhance Client Experience May 30, 2016
- May 9, 2016 The 100-Mile Commute & the Employee Experience May 9, 2016
- May 5, 2016 Contextual Interaction in Project Delivery May 5, 2016
-
April 2016
- Apr 29, 2016 Is your organisation evolving towards the Untethered Workplace? Apr 29, 2016
- Apr 29, 2016 Business meets Design Apr 29, 2016
- Apr 18, 2016 Art & Science of Project Management Apr 18, 2016
- Apr 7, 2016 Is failure a hindrance to creativity Apr 7, 2016
- Apr 6, 2016 The Future of Work & Workplace is Untethered Apr 6, 2016
- Apr 6, 2016 Enhancing Client Experience Apr 6, 2016
- Apr 6, 2016 Sustainability is circular journey Apr 6, 2016
-
February 2016
- Feb 5, 2016 Towards Transparency and Accountability Feb 5, 2016
-
November 2015
- Nov 23, 2015 A Fork in the Road for Project Management? Nov 23, 2015
- Nov 23, 2015 Disrupting the Business of Design – Architecture Nov 23, 2015
- Nov 10, 2015 Disrupting the AEC Industry Nov 10, 2015
- Nov 4, 2015 Leadership is that “little extra” in Project Management Nov 4, 2015
- Nov 4, 2015 Work-life is an attitude; it is all in the head Nov 4, 2015
- Nov 3, 2015 Are we not humans, so be humane? Nov 3, 2015
-
October 2015
- Oct 27, 2015 Partnering vs Minding the Store Oct 27, 2015
-
May 2015
- May 11, 2015 To begin Start at the End – Supply Chain Logistics May 11, 2015
- May 4, 2015 Changed Thinking to achieve a Changed Outcome May 4, 2015
-
April 2015
- Apr 30, 2015 Design to Evolve Built to last – Future of Buildings Apr 30, 2015
- Apr 22, 2015 Starting with the End in Mind Apr 22, 2015
- Apr 17, 2015 What’s next for the facilities – workplaces? Apr 17, 2015
- Apr 17, 2015 It’s time to re-tool - innovate the construction delivery model – a shift in mindset is urgently required to fix an industry that is broken. Apr 17, 2015
- Apr 17, 2015 Turning customer experience on its head Apr 17, 2015
- Apr 17, 2015 Are restrictions or problems a hindrance to creativity? Apr 17, 2015
- Apr 17, 2015 What’s next for Architecture? Apr 17, 2015
- Apr 17, 2015 Why must the AEC (Architecture, Engineering and Construction) industry disrupt? Apr 17, 2015
- Apr 17, 2015 Is your industry ready to be disrupted, mine is? Apr 17, 2015
- Apr 17, 2015 Are you disrupting traditional AEC industry processes to enhance client experience Apr 17, 2015